feat: complete Phase 69 of generated-code drift diagnosis and update task plan status

This commit is contained in:
2026-07-15 00:04:24 +08:00
parent 3037cfe059
commit 6adcec4849
3 changed files with 10 additions and 6 deletions
+2
View File
@@ -5,6 +5,8 @@
- User reported `Main Verify generated code is committed` exit code 1 with a diff near generated `MediaSupplyOrder`.
- Added Phases 69-70 to reproduce the exact CI generation step, regenerate the affected artifacts, and verify a stable second generation.
- Existing uncommitted challenge/circuit-breaker work is preserved and will not be reverted.
- Reproduced CI with local sqlc v1.30.0. Only `server/internal/tenant/repository/generated/models.go` changed, adding three missing media-supply favorite models (26 lines).
- Phase 69 is complete; the affected generated artifact is now regenerated and Phase 70 verification is in progress.
## 2026-07-14T18:45:00+08:00 - Local same-platform challenge circuit breaker started